Site icon Current Hunt

Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan

Union Minister of New Renewable Energy furnished the current status of the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM KUSUM) scheme through a written response in Lok Sabha.

PM-KUSUM

Components

  1. Component-A: Setting up of 10,000 MW of Decentralized Ground/Stilt Mounted Solar Power Plants on barren/fallow/pasture/marshy/ cultivable land of farmers.
  2. Component-B: Installation of 20 Lakh Stand-alone Solar Pumps in off-grid areas.
  3. Component-C: Solarisation of 15 Lakh Grid Connected Agriculture Pumps through: Individual Pump Solarisation and Feeder Level Solarisation.
Exit mobile version